Text Box: AEDC Security Project – Arnold Air Force Base

Completed: Spring 2004
Owner: Arnold Engineering Development Center – U.S. Air Force
Project Manager: Corey Griffin
Superintendent: Chris Smith

The project consisted of constructing a crash-rated barrier protecting the Main Building at the Arnold Engineering Development Center. The barrier was 2,000 feet long consisting of reinforced masonry walls, a tension steel cable system, and four crash-rated gates.